Visibuild
Create
Log in
Sign up
Roadmap
Feedback
Feature Requests
Changelog
Boards
Feature Requests
Powered by Canny
Feature Requests
Details
Showing
Trending
Sort
Trending
Top
New
Filter
Under Review
Planned
In Progress
Complete
posts
Ability to hide unstarted inspections in the dashboard view
We want to create our inspections ahead of time, however, the dashboard is then full of open and upstarted inspections - it would be great to be able to hide the upstarted items to reduce clutter in the dashboard
1
·
planned
13
Push/Email notification reminders
ability to select Visis and send alerts to members/companies for outstanding works
3
·
planned
88
Project ticket templates
Ability to create unique tick templates per project, this would allow project teams to include project specific fields in their customer facing ticket portals.
2
·
planned
17
Hard hold points
In the manufacturing biz, they require rigid hold points before proceeding to the next stage of works. The operations manager requested that the following stages not be actionable till the prior stage is fully closed out.
1
·
planned
28
Export/Print to PDF dashboard views to send out to project partners
1
·
planned
63
Pin visis to drawings to show exactly where they are
Pinpoint on a floor plan where defect/issue is - when logging defects or issues, it would be great to be able to drop a pin on the floorplan to pinpoint the exact location of the defect
7
·
planned
137
Preloading Attachments to Inspection Template
Standard details that are consistent across an entire project such as reinforcement lap length, concrete testing minimum requirements or typical pour area mark-ups could be attached to an inspection template.
2
·
planned
71
Ability to create "Teams" within my company, that I can assign tasks and inspections to
I want to be able to assign work (templates, inspections, issues) to different teams within my business. I'd like to be able to add these teams as assignees within inspection templates.
2
·
planned
36
Being able to download export from the screen rather than it email be. If it goes into my downloads
1
·
planned
3
Total number of inspections closed across projects on Company Dashboard
1
·
planned
14
Load More
→
Powered by Canny