When I load an ITP from the company library into a project, all inspections and tasks are assigned to BE. Even if I reassign the template to the subcontractor, I still need to change the assignee in each inspection and task. It would be beneficial to have a feature that allows bulk updating of the assignee in the template library at a project level before deployment.
Created by Canny AI
·